Brooks Reach Building adventure

Come with us now on a tale of the mighty house building.

With a rooftop over our heads

That’s right, the roof is on!!!! The corner pieces are still to be laid but that won’t be til later in the build. There is some nice shiny stuff on the inside of the roof though.IMG_3165 (Large)

Downpipes have been installed (still to be painted though) along with gutters and fascia. Downpipes and roof
Hubby and I are still trying to decide if it was wise to go with Sandbank for our downpipes or if it would have been better going monument. What do you think? Let me know in the comment section below.

We have Howard Ryan (HnK Ryan) going through the house with our SS tomorrow for the first of two private inspections. This one is the lock up / Pre-plaster inspection and Howard will be onsite between 7am and 8am take photos, record any issues and send through the report to us later in the evening. We then have to forward this report onto our SS.

Weather is dreadful outside right now but forecast for the week is mostly sunny. Praying for a little more sunshine so the tradies can finish everything they need to before moving inside!

Bathy times

Branden in the bath… Stop looking, you pervs!

Chef Ruby in the future kitchen

Nearly done with the roof..Back entryFront entryrooftiles

IMG_3164

IMG_3169

Pantry

5 Comments »

Gutters, and fascia, and roof! Oh, my!

We headed out to our lot yesterday after a beautiful weekend away with our Bible Study group in Killcare (Central Coast region). It was a beautiful 20 degrees (only a week until winter hits too.)

Sad to say there was no roof up yet, BUT there were roof tiles and battens ready to be installed. Our bricks have also had a beautiful spray clean 😀

Roof Tiles

roof riles

Battens

Obligatory happy pose

Hot hubby doing his thing
We are loving the gutters and fascia and can’t wait to see it all together when the eaves, downpipes and roof are installed.

So we were originally meant to move the bricks today after work but the SS called on Friday and said not to bother as there were several delays on the house due to wet and windy weather last week. There was still scaffolding and the roof tiles in the way so SS said we could move the bricks once they head inside to work in a few weeks. It all worked out in the end as Hubby and I came down with terrible colds so we would not have been very productive anyway.

SS advised Lock up should be less than 3weeks away now 🙂 Lovely Nat over on Homeone mentioned on the forum today that they were busy working away on the roof with a cute little conveyor belt delivering the tiles onto the roof!Cheer

Gutters and Fascia

Measuring

Gutters and Fascia

3 Comments »