Well It’s been nearly a month since we received the keys to our beautiful new home. We’ve done a lot in that time and yet have not accomplished anywhere near as much as we’d thought or hoped we would.
Moving is stressful!
Organising tradies is time consuming!
Cleaning and more cleaning and still cleaning is exhausting!
But overall we are LOVING being homeowners!! We’ve settled into our regular run to/from work, the construction noise early in the morning doesn’t bother us so much and our neighbourhood is just delightful!
Our SS has been amazing, even more so now we’ve had handover. His team are coming back next week to fix the pantry shelving height and do the paint touch-ups we need.

The major updates to the house since keys:
We have air conditioning
wpid-IMG_20130823_064804.jpg
IMG_3714

wpid-IMG_20130822_103509.jpg

Our landscaping has started
20130912_172805

NBN was installed
20130826_153159

And we’ve slowly started putting together other rooms in the house
Entryway
Familyroom

Family2

Media
Media2

kitchen lighting

Kitchen

Meals

Pantry

Still lots of bits and pieces to do, but we’re enjoying it!
Hope you liked the sneak peek at our lovely ‘Manor’.

14 Comments »

Bathroom & laundry tiling

Last Saturday we did a quick drive by the lot  just to see if we could peer in a few windows and check out if anything had been done on the bathrooms. When we arrived we saw the front door was open!!! We called our Site Supervisor and left a message just to see what the dealio was. There was work going on at other Clarendon sites in the estate so we perhaps someone had left it open and was coming back; either way we wanted to follow it up with Shrimpy so he was aware.

We took the opportunity to pop inside and show one of my little sisters the place.

Things haven’t progressed as much as we thought they would. Tiling is underway, our stone bench tops were due to be installed today along with shelving for pantry etc, the tiler will then be back to install our metaline splashback. The painter is meant to be out some time this week too for the first coat of paint followed by gyprockers inspection and then final coat of paint. So SS said there should be someone onsite everyday, which is what we’ve been expecting since lock up anyway. Surely they are as keen to get things finished as we are?

Here is a shot of the main bathroom (tiles still need to be laid around bath area and next to the window)

Toilet floor tiled (wall tiles to be laid)
IMG_3427
Ensuite (mostly finished; mosaic still to be laid above vanity)


Laundry floor tiled (wall tiles still to be laid)

Most of the doors in the house have been installed too, including the wardrobe doors
IMG_3430
We got a call from Wynstan last week to confirm SS’s number so he could get onsite and do final measure up for our plantation shutters and get them ordered in. South Coast Floor Coverings were onsite last week to measure up for our carpets and tiles and today they sent through the invoice for around $10k. Our tiling job has been tentatively booked to be installed in the second week of August should we have the keys by then.
AHHHHH it’s so close now, hopefully on the homestretch. So ready for moving day!

4 Comments »

The beginnings of our kitchen

Last week was terrible weather wise. I think we’d all forgotten how often it rains in Wollongong, but it was worse with this recent downpour as it rained all. week. long.

While progress haltered on most sites we know the carpenter was on our lot at least for a few days as we saw him there on Thursday when we had our check measure for our plantation shutters. We’re not sure if anyone was meant to be with him or not but when we arrived he was just sitting on a milk crate for the longest time … When we finally went inside and introduced ourselves and kinda said ‘this is our house’ he slowly moved around and cut a few pieces of wood for the architraves during the three hours we were there. When we were leaving hubby looked in the window and he had gone right back to sitting down on the milk crate!!! It’s so frustrating as we heard him telling the guy from Wynstan just how flat out they all are etc and there isn’t much more to be done for our build so I don’t understand why he was just so relaxed and seemingly lazy.

The purpose of our visit to the house was to measure up the blinds/flyscreens/shutters as I mentioned above but it was also a great excuse to actually get inside and see what has been done.
We were told on Friday 21st of June that last week we were meant to see cornices, skirting, architraves, kitchen and bathroom cabinetry installed with wet tiles being delivered and possibly installed on the Thursday/Friday. What we actually saw on Thursday was the cornices were installed, cabinetry had been completed for the kitchen and bathroom/ensuite and the carpenter only started the architraves while we were there onsite

But progress is progress. Here are some quick snaps we took of the kitchen

Kitchen
IMG_3350
IMG_3391
IMG_3353

IMG_3389
IMG_3356

Kitchen 27.06.13

Our bathroom and ensuite vanities are the same

IMG_3366

And just because
Ruby kitchen

IMG_3380

Hopefully we’ll get a call from Shrimpy tomorrow saying everything has been done and the house is good to go I can hope, right?

6 Comments »