Brooks Reach Building adventure

Come with us now on a tale of the mighty house building.

Home

Well It’s been nearly a month since we received the keys to our beautiful new home. We’ve done a lot in that time and yet have not accomplished anywhere near as much as we’d thought or hoped we would.
Moving is stressful!
Organising tradies is time consuming!
Cleaning and more cleaning and still cleaning is exhausting!
But overall we are LOVING being homeowners!! We’ve settled into our regular run to/from work, the construction noise early in the morning doesn’t bother us so much and our neighbourhood is just delightful!
Our SS has been amazing, even more so now we’ve had handover. His team are coming back next week to fix the pantry shelving height and do the paint touch-ups we need.

The major updates to the house since keys:
We have air conditioning
wpid-IMG_20130823_064804.jpg
IMG_3714

wpid-IMG_20130822_103509.jpg

Our landscaping has started
20130912_172805

NBN was installed
20130826_153159

And we’ve slowly started putting together other rooms in the house
Entryway
Familyroom

Family2

Media
Media2

kitchen lighting

Kitchen

Meals

Pantry

Still lots of bits and pieces to do, but we’re enjoying it!
Hope you liked the sneak peek at our lovely ‘Manor’.

14 Comments »

We have keys!!

Yesterday was the day.. we received our keys!!
SS was onsite from about 12.10pm to go through paperwork and sign over the keys to us. I even got to hold the ‘builders’ key and try it in all our locks to prove that they have changed them and only we now have access.

We weren’t able to do a full walkthrough as the tiler from South Coast flooring was doing his thing (remember how i said he was meant to be done Sunday, or monday at the very latest?! He mentioned he wasn’t planning to be done until Friday. But more on that can be found under the ‘issues’ tab on the right if you’re really interested) So we stood awkwardly around the kitchen bench and went through our ‘handover folder’ and discussed certificates, warranties and completed the HIA booklet. There were a few outstanding issues that were noted: two kitchen cabinet doors were still away being fixed, no lights/shades installed, appliances still to be delivered, door handle to WIL still needs to be replaced, Manhole cover replaced, various paint touchups. The one thing we forgot was that the WIR still doesn’t have a door handle or door plate thingi. Hubby will follow up with SS during the week.
We have around 90days now to note any other defects we want the Clarendon warranty team to fix/replace and after we lodge our form it will be reviewed and then someone will visit our house to assess the issues.

Appliances delivered in our garage today ready for install tomorrow or Thursday.
IMG_20130820_165832

Our hot water system is installed and good to go
20130820_163015
Here is a shot of our ensuite too; tiling still needs a wipe down
20130820_162537
So forgetting about the stressful issues with the tiler and company; Handover went great. We received a lovely ‘Sheridan’ towel and fragrance package from Clarendon. B sheridan 20130820_162311
Our Site Supervisor has really been great the last few weeks which has really helped us manage the stress and disappointments we’ve faced.

Tomorrow is moving day! WOOOOOOOOOOOOOOOOOOOOOOOOOOT, finally!!

4 Comments »

2 more sleeps (and then keys will be ours. MUHAHAHAA!!)

Keys Keys Keys Keys sung to tune of:
WAHOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO!! Our bank released the funds early Thursday and after several calls/emails to our CSC and Clarendon accounts department on Friday it was confirmed around 2pm that they had received our final payment! Our SS called hubs and booked in Handover for Monday. He had our keys with him but not the fancy handover leather book thing they give out. SS also has arranged for our appliances to be installed Monday morning before we get keys so that’s nice.

We went for a quick drive out to Brooks Reach yesterday afternoon to check in on the tiling. We really love the tile we chose and how it’s all blending well together (obviously the grout still needs to be done)
20130816_155221

DSC_0067
The tiler has done a great job so far considering it’s only him working on them. He told the SS he should be done by Sunday.. BUT he wasn’t onsite at all today so this makes us a bit worried.
Tiler needs to be done by Monday morning so Clarendon’s painter can pop in on Monday morning and finish the nib walls in the kitchen. SS is also having our appliances installed on Monday before handover too. 🙂 woo!! South Coast Floor Coverings were meant to be installing carpet on Monday, but last week they pushed it back to Tuesday and when we rang to confirm yesterday they’ve now told us Thursday is the earliest :S We’re getting a bit frustrated with them now as they just aren’t consistent in what they say. We’ve let them know that we’re actually moving in on Wednesday and won’t really be setting up furniture in the rooms for one day just to try and move it out the next for their carpet layer. Hopefully that gets sorted and they keep their original agreement with us.

We’ve organised for our gas/electricity to be switched over to AGL, organised our mail redirection, having the NBN connected on the 26th (WOOTWOOTWOOT) arranged a cancellation date for our services in this apartment .. we had a very productive afternoon yesterday haha.
Today we also went out and purchased some more furniture, a lovely Bosch dishwasher and a bunch of other random things for the house. It still doesn’t feel real though!

There are still minor issues with the home that we’ll take note of when we sign for the keys on Monday: *scratched sliding door *kitchen cabinet still away being repaired *back stop tiling still uneven *bathroom cabinet door not aligned *Lightbulbs/shades not installed yet.
These are just the few things we saw while we were onsite for 20mins 🙂 hopefully most of it will be fixed before we get keys.

4 Comments »

The beginnings of our kitchen

Last week was terrible weather wise. I think we’d all forgotten how often it rains in Wollongong, but it was worse with this recent downpour as it rained all. week. long.

While progress haltered on most sites we know the carpenter was on our lot at least for a few days as we saw him there on Thursday when we had our check measure for our plantation shutters. We’re not sure if anyone was meant to be with him or not but when we arrived he was just sitting on a milk crate for the longest time … When we finally went inside and introduced ourselves and kinda said ‘this is our house’ he slowly moved around and cut a few pieces of wood for the architraves during the three hours we were there. When we were leaving hubby looked in the window and he had gone right back to sitting down on the milk crate!!! It’s so frustrating as we heard him telling the guy from Wynstan just how flat out they all are etc and there isn’t much more to be done for our build so I don’t understand why he was just so relaxed and seemingly lazy.

The purpose of our visit to the house was to measure up the blinds/flyscreens/shutters as I mentioned above but it was also a great excuse to actually get inside and see what has been done.
We were told on Friday 21st of June that last week we were meant to see cornices, skirting, architraves, kitchen and bathroom cabinetry installed with wet tiles being delivered and possibly installed on the Thursday/Friday. What we actually saw on Thursday was the cornices were installed, cabinetry had been completed for the kitchen and bathroom/ensuite and the carpenter only started the architraves while we were there onsite

But progress is progress. Here are some quick snaps we took of the kitchen

Kitchen
IMG_3350
IMG_3391
IMG_3353

IMG_3389
IMG_3356

Kitchen 27.06.13

Our bathroom and ensuite vanities are the same

IMG_3366

And just because
Ruby kitchen

IMG_3380

Hopefully we’ll get a call from Shrimpy tomorrow saying everything has been done and the house is good to go I can hope, right?