Brooks Reach Building adventure

Come with us now on a tale of the mighty house building.

4 weeks til Handover

After several attempts to get through to our site supervisor, darling hubby made contact on Monday and got the following brief updates:

  • Plumber has been overseas so the stormwater pit and sewer vent will be moved next week upon his return
  • Taps in vanities, showers, sink have all been installed
  • Electrical mark up has been done
  • Shelving has been installed in robes and pantry
  • Painter is meant to be back sometime late this week/early next week to complete the second and final coat of paint
  • Toilets to be installed later this week/next week
  • PCI (Practical Completion Inspection) Walkthrough will be 2/3weeks then a week following to allow for any touch ups etc and we should get keys first week of August if everything goes to plan. We’re aiming for the second or third week in August though just in case, don’t want to be getting our hopes up to high at this point.
  • Not sure when water tank/gas hot water system will be done – I assume sometime over the next two weeks!

I received a call on Monday to say there was an issue with our splashback. We originally chose to upgrade a ceramic tile splashback in the kitchen to a Metaline panel spanning the entire bench length (around 3m). It was one of our most expensive upgrades and not an easy one to make. Last week that splashback was meant to be installed, but apparently issues have arisen over the past few months with bubbling and YHK (Forstan kitchen company that Clarendon Homes uses) no longer endorse the product. A lady from YHK offered a free upgrade to a glass splashback for us which we have accepted. We now have to wait for a call from their supplier to arrange a measure up onsite and they can try and match a colour for the glass to a paint swatch. We’ll be sticking as closely as we can to a metallic green with gold flecks (like our original splashback). The lady said it can be installed after handover but I adamantly stated we wanted it done beforehand. Hopefully we’ll get a call soon arranging the site visit so we can get it behind us.

Freedom furniture are delivering our new couch/armchairs on Friday so we have to store them in our tiny apartment til the move. 

<—This is what we’re getting for the family room. It’s called the ‘Harry’ and it made me love it even more; I’m a huge Harry Potter fan!

Rather than getting another couch we chose two accent chairs. Chevron is amazing!

 

 

 

 

 

 

 

 

 

This has been my favourite purchase for the house so far other than my gorgeous Green Apple Kitchenaid stand mixer (thanks Grandma Judy!)

I have heard that getting the keys can be a huge anti-climax but we’re trying to stay positive and excited about it all. Hopefully only a few short posts away from the grand tour 😀

Advertisements
5 Comments »

The beginnings of our kitchen

Last week was terrible weather wise. I think we’d all forgotten how often it rains in Wollongong, but it was worse with this recent downpour as it rained all. week. long.

While progress haltered on most sites we know the carpenter was on our lot at least for a few days as we saw him there on Thursday when we had our check measure for our plantation shutters. We’re not sure if anyone was meant to be with him or not but when we arrived he was just sitting on a milk crate for the longest time … When we finally went inside and introduced ourselves and kinda said ‘this is our house’ he slowly moved around and cut a few pieces of wood for the architraves during the three hours we were there. When we were leaving hubby looked in the window and he had gone right back to sitting down on the milk crate!!! It’s so frustrating as we heard him telling the guy from Wynstan just how flat out they all are etc and there isn’t much more to be done for our build so I don’t understand why he was just so relaxed and seemingly lazy.

The purpose of our visit to the house was to measure up the blinds/flyscreens/shutters as I mentioned above but it was also a great excuse to actually get inside and see what has been done.
We were told on Friday 21st of June that last week we were meant to see cornices, skirting, architraves, kitchen and bathroom cabinetry installed with wet tiles being delivered and possibly installed on the Thursday/Friday. What we actually saw on Thursday was the cornices were installed, cabinetry had been completed for the kitchen and bathroom/ensuite and the carpenter only started the architraves while we were there onsite

But progress is progress. Here are some quick snaps we took of the kitchen

Kitchen
IMG_3350
IMG_3391
IMG_3353

IMG_3389
IMG_3356

Kitchen 27.06.13

Our bathroom and ensuite vanities are the same

IMG_3366

And just because
Ruby kitchen

IMG_3380

Hopefully we’ll get a call from Shrimpy tomorrow saying everything has been done and the house is good to go I can hope, right?

6 Comments »

Kitchen Spec

Our kitchen meeting was part of our first Clarendon Create appointment but I felt it needed it’s own post as it’s such an important part of our home.
The kitchen has always been my focus during the house hunting and now building process. Thankfully I have an incredible husband that has supported my kitchen-crush during this whole time. A promise of never ending brownies may have also helped!

Our kitchen will have 3m long stone benchtops with a breakfast bar extension making the island bench even wider. We will have a 900mm gas cooktop, canopy ducted rangehood and 600mm electric oven. We will eventually have a side-by-side fridge/freezer with a filtered water point. WE HAVE A HUGE WALK IN PANTRY! We haven’t picked out tiles yet as our builder is making us wait until construction is under way (who knows why!) but they’ll be a light colour like this:ZIRVE BEIGE (MARBLE) - Tile Sample from QQ

We describe the feel of our future kitchen as open and earthy with the green and brown tones. One of the best upgrades we made was our kitchen sink to be a double bowl sink. Best $15 upgrade I think! Of course we had to source specific models and ask for a price on all the items we wanted, but that wasn’t too much work. We also upgraded our oven to a newer model too for a small fee.
Branden’s Grandma & Poppop gave me some money towards my KitchenAid that I’ll purchase as a house warming gift to myself when we move in. I’m thinking green apple KitchenAid Green Apple Artisan or possibly Cobalt Blue (B’s fave colour is blue) Cobalt Blue KitchenAid. The hubby will probably spend his gift money on electronics or something for the theatre room. Boys and their toys!

The original quote for upgrades came to a total of $12,970!!!!!! *wide eyes*. We just couldn’t believe the cost for some of the items. We didn’t get a quote for the tepanyaki built in cooktop with wok, I think that would have been neat but very expensive. We would have loved to have SMEG appliances too but agreed we could upgrade to those later once we settle in and save for those kind of things.

Below are the items we had quoted (with approximate figures):

  • Craftwood bulkheads above cabinets (between ceiling and cabinets) $420 Did not get this upgrade (Essentially it’s a fake wall so you don’t have to dust above your cabinets. How silly)
  • Provide matching door colour above canopy rangehood $192 Did not get this upgrade
  • Matching door colour bottoms to matching side of wall cabinets either side of rangehood $190 Did not get this upgrade
  • 300mm depth extra overhang to breakfast bar $400
  • 20mm thick stone benchtop, pencil round edge $4000
  • Laminex crystal gloss melamine doors/panels (Espresso) $2100 Did not go with this upgrade
  • Brushed aluminium laminated kickboards $420 Did not get this upgrade
  • Lamanix metaline splashback (including behind rangehood), Champagne Perle $2600
  • 1 x bank of 2x pot drawers righthand side of underbench oven $220
  • Soft closing drawers – $820 Did not go with this upgrade
  • Soft closing door hinges – $384 Did not go with this upgrade

*Microwave provision removed
*Aware that our fridge door will not extend fully due to wall cavity.

Our total for upgrades/changes etc came to around $6000

This is our beautiful kitchen plan

Kitchen drawing

Splashback: Laminex Metaline Champagne Perle champagne_perle splashback You can’t tell from the picture but it is a soft green colour that hs a subtle gold fleck through it. So pretty.

Benchtop: Quantum Quartz New Diamond white New Diamond White stone benchtop

Kitchen cabinets: Wilsonart Chocolate O547 Morro Zephyr 4846

Cooktop: westinghouse ghr95s – 5 burners baby! GHR95S-14700
Oven: POR667S POR667S-14158

Sink: R175 MK II double bowl sink R175 MK II double bowl sink

rangehood: WRF900CS-6286 – Canopy Rangehood WRF900CS-6286 - Canopy Rangehood

The colours will end up looking something like the below design sample (The design is different though)

Envisage Kitchen design

Up next: Clarendon Create pt2 (internal colours, alarms, bathrooms and other not so exciting things)…

9 Comments »