Nearing Practical Completion Inspection (final walk-through)

on July 28, 2013

Sadly I haven’t had much to report on with regards to the build . Progress has slowed right down with someone onsite roughly 1-2 days a week (if at all). Once the build is complete I will be posting my full review along with the issues we’ve faced along the way.

Since my last post not much has happened. One of the things we’re struggling with is lack of communication from our Site Supervisor and the inconsistencies in the information we’re being provided.
So, what has been completed since my last post?

  • Garage door has been installed and painted
  • Front/back door has been painted
  • Painter has completed second (final) coat of paint
  • Most of the light battens were installed
  • Most powerpoints were installed
  • Most light switches installed
  • External taps installed with markings for rainwater
  • Shelving looks complete
  • Data and phone points have been installed
  • Smoke alarms installed

Outstanding issues/ things to be completed

  • No site fence or right side of house
  • Some lightswitches
  • Outdoor lights installed
  • Some powerpoints (including external)
  • Not all doors have been put back on
  • Sewer vent and stormwater pit still not moved <—- STILL!!! AGH!!!!!!!
  • No water tank
  • No hot water system
  • No rangehood or oven
  • No toilets, shower frames, taps
  • Bath not installed (8 roof tiles sitting in the bath cavity)
  • No mirrors
  • Tiling still incorrect in ensuite
  • One pot drawer in kitchen was just sitting on our benchtop
  • Cabinetry in bathroom has been taken apart and left off it’s hinges
  • There was a small bag of cement open and spilled on the floor in the meals area; someone had dumped it or got it wet as there is cement sprayed all over one of the meals walls
  • Sandbank paint on one of the glass sidelights
  • Side downpipe still needs to be completely painted
  • Further damage to slab at front left corner of the house and ensuite extension area
  • So much rubbish and debris all over the front of the yard (even though it’s meant to be confined to the bin in the back)
  • Rocks still have not been moved off our neighbour’s site
  • Still awaiting call from splashback installer to arrange measure up and install

SS didn’t contact us again this week so Hubs called him yesterday. We don’t think our SS has been on site for a while as the first thing he said was that everything was pretty much done. (See what I mean about inconsistencies?!)
We were assured that the cleaner will still be onsite on Monday. Apparently they are waiting for sinks (? not sure about this as they looked done to us) and mirrors. SS said that the plumber had been out.
He’ll check the calendar tomorrow and give us a call to lock in the date for our PCI (Practical Completion Inspection) – we said that the original dates of Wed & Thurs are still best for us.
We also mentioned the issue with the missing mosaic tiling in the ensuite. Shrimpy said this will be things we go over during the PCI walkthrough. We thought we’d bring it up in case it could be resolved sooner rather than later.

The subject then came around to money; we were asked if we’d received our final invoice yet. Hubby very politely advised our SS that we had tried getting details regarding our provisional allowance (we asked to see invoices so we could prove they had used what they are billing us for) as we wanted to know if we would be credited anything back. We were told by our new CSC that our SS has to start that process and tell the office to issue the final invoice. SS said he will sort that out and we should expect the final invoice within 11-12days.
So, taking into account defects that will need to be fixed at PCI and time for the bank to inspect the house and release payment we could be looking at the third week of August now, if not later. Blerrrrrrrrrrrrgh

So will we get to do our walk-through this week? We’re not sure anymore as there are so many outstanding issues that are yet to be rectified. We’re hoping that our SS will visit our site on Monday and assess all that needs to be done.

We have just about finished packing up our little apartment, bar the essentials. We are so ready for this move.
Here are some photos we’ve taken over the past two weeks; we’re loving our colour choices and how they have all blended so well together in the end.

garage

front door

21.07.13
B&R edit


And one for giggles: An accidental dramatic pose as I got in the way of hubby’s photo :p
rubes door

Advertisements

One response to “Nearing Practical Completion Inspection (final walk-through)

  1. Kerith says:

    Hmmm, there does seem a lot to do still. We have all your items to install plus 2 weeks of painting & flooring. They are telling us we are still 3-4 months away from settlement. All the best for the coming weeks.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

%d bloggers like this: